Design and detailing of the soil – structure interaction for the Main Wharf North project was a considerable challenge for all involved. The ground improvement was required to stabilise the existing fill and alluvial soils, provide the majority of the lateral restraint for the entire wharf and back span slab in a highly seismic zone, all without excessive restraint of thermal and shrinkage actions. Andy and his team provided strong leadership in this complex interface, relentlessly driving efficiency and value in the solution.
Daniel Patten - Engineering Manager, McConnell Dowell